Existing Building Commissioning Toolkit
Templates and Sample Documents
These documents are examples of many typical Existing Building Commissioning deliverables and reports. Presented in Microsoft Word© format, they are easily customized for specific projects, clients and project types.
| Description | Source | Date | |
|---|---|---|---|
| RFP | Request for Proposal Checklist for Existing Building Commissioning services |
PECI |
2007 |
| Interview Form | CCC | 2007 |
|
| List of Building Characteristics | CCC | 2007 |
|
| Operating Requirements | CCC | 2007 |
|
| Monitoring Plan | CCC | 2007 |
|
| Ongoing Cx Plan | CCC | 2007 |
|
| Implementation Report | Implementation Summary Report - Appendix A to the Ongoing Commissioning Plan |
CCC | 2007 |
| Sequence of Operation | Sequence of Operation -
Appendix B to the Ongoing Commissioning Plan |
CCC | 2007 |
| Monitoring Plan | Monitoring Action Plan -
Appendix C to the Ongoing Commissioning Plan |
CCC | 2007 |
| Calibration Plan | Calibration Plan - Appendix D to the Ongoing Commissioning Plan
Sample |
CCC | 2007 |
| Training Plan |
Training Plan -
Appendix E to the Ongoing Commissioning Plan |
CCC | 2007 |
Download all templates and sample documents here. (Zip file, 3 MB)
Other Sample Documents for Existing Building Commissioning
The following additional sample documents and templates have been compiled by the CCC for easy access and reference.
| Description | Source | Date | |
|---|---|---|---|
| RCx Plan | PECI |
|
|
| Design Intent | Design Intent for an existing building |
PECI |
|
| Final Report | Final Report for a commercial building |
PECI |
2002 |
| Final Report | Final Report for an office building |
PECI |
2000 |
| Final Report | Final Report for an office building |
PECI |
2003 |
| Systems Manual |
PG&E |
|
IMPORTANT NOTICE: These sample documents are provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. These documents are neither approved nor intended to serve as a standard form. The user of these documents should confer with qualified advisors with respect to its commissioning and other documentation.